Company History

- 1987: The office of (The Engineers) was established.

- 2002: The office was upgraded into a company with the name of (Engineers General Contracting Company Ltd.).

- 2023: The company name and activity were modified into (Engineers Contracting and General Trading Company Ltd.).

- 2024: The company name and activity were modified into (Engineers Company for Contracting, General Trading, Installation, Maintenance and Supply of Fire

Extinguishing and Public Safety Systems, Ltd.).


Projects

Date Beneficiary Works & Projects
1989-1987 Old Hillah Camp Restoration and reconstruction of a two-storey building
1989-1987 Babylon Tourist Hotel Meeting room establishment /foundation stage
1989-1987 Various places in Hillah Establishing 12 guard points
1989-1987 Various places in Hillah Restoration of 15 schools
1989-1987 Babylon Nursing Home Medical room renovation
1989-1987 Babylon Nursing Home Supply of furniture and equipment
1989-1987 Al-Mahawil District Renovation and reconstruction of Al-Mahawil Police Station
1989-1987 Abi Gharaq area Renovation and reconstruction of Abu Gharaq Police Station
1989-1987 Al-Tuhmazia neighborhood Paving Al-Tahmaziyah Road
1989-1987 Al-Musayyab District School restoration and reconstruction
1989-1987 Hilla Center Al-Jawahiri School Restoration
1989-1987 Hillah Religious University Design and construction of pure water network and heavy water network
1989-1987 Hillah Religious University Design and construction of low voltage power distribution station
1989-1987 Hillah Religious University Preparing, connecting and operating kitchen equipment and appliances
1989-1987 Al-Jami’ya district Paving a road in Hilla Center
1989-1987 Baghdad/Doura district Heavy water station restoration
1989-1987 Hilla/ Al-Dibla district Establishment and construction of a pure water station
1989 University of Babylon Implementation of the foundations of dormitory departments
1989 University of Babylon Implementation of the foundations of the College of Engineering
1990 University of Babylon Generators and electricity transformers equipment
1990 University of Kufa Implementation and modification of low voltage electricity network
1990 University of Kufa Maintenance and operation of air conditioning units
1991 Hilla Maternity Hospital Equipment maintenance and operation
1991 Marjan Hospital/ Babylon Building a house for female and male doctors
1992 Hillah Surgical Hospital Equipment maintenance and operation
1992 Karbala Surgical Hospital Equipment maintenance and operation
2001 Al-Musayyab Project Build and install a telecom switchboard
2001 Babylon Communications Implementation of Al-Hashemiya telecom switchboard building
2001 Al-Fatih Laboratory/Hitteen Company Construction of retaining walls
2001 Hitteen Company Create tank bases
2001 Hilla Gas Plant Civil maintenance works
2002 Nadir district / Babylon Create a water station
2002 Babylon/ Al-Hadba Company Construction of culverts for the drainage project
2002 Al-Ibrahimya District / Babylon Create a water station
2002 Al-Shomali District / Babylon Implementation of a switchboard network
2002 Al-Kifil District / Babylon Implementation of a switchboard network
2002 Al-Saddah District / Babylon Implementation of a switchboard network
2002 Department of Chemistry / University of Babylon Establishing the foundation and structure
2004 University of Babylon Establishing 11kv high voltage power line
2005 University of Babylon Supply, installation, operation and maintenance of 250KVA generators
2005 University of Babylon Construction and implementation of sheds and casting concrete foundations
2007 Abi Gharaq area/ Al-Jawad neighborhood Implementation of 12-grade school
2007 Baghdad / Al-Mansour neighborhood / Block 601 Implementation and rehabilitation of sewerage networks
2010 University of Babylon Supply, installation, operation, and maintenance of 1000KVA generators
2010 Hilla Expansion of Hilla-Karbala Road, Part One, 5 km
2011 Hilla Center Paving streets in Al-Bakarli neighborhood
2011 Hilla Hilla-Karbala Road Expansion Part Two
2011 Diwaniyah / Al-Wahda neighborhood Rehabilitation of electricity network
2012 AlBu-Alwan village Maintenance of AlBu-Alwan Road, 14 km long
2024 Middle Euphrates Electricity Supply and inspection of 33/11kV electrical transformers, 5 units
2024 Oil Projects Company/Dhi-Qar Design, implementation and installation of 6 elevators
2024 Electricity Production Company / Middle Euphrates Supplying Reverse Osmosis Cells, 1150pcs
2024 Electricity Transmission Company / Middle Euphrates Supplying 33/132 kV mobile stations
2024 Babylon Water Directorate Equipping various sizes of water pumps and submersible pumps